Computing, Network and Telecommunications Projects Anderson Building Telecommunications (completed)
Anderson Building Telecommunications Stan Harris, project leader Installation of network and telecommunication services for Anderson Building (Journalism) construction. Status report (Word) (3/23/07)
Tom Travis, project leader Apply SSL certificates to Oracle Application Servers for banner services, INB and CyberBear, test and production. Status report (Word) (1/25/07)
Deb Wiederspan, project leader Cross train team members on specific CallPilot Administration features Status report (Word) (2/28/07)
Clapp 3rd Floor Move to Griz Stadium Stan Harris, project leader Provide data service on West side of Washington Grizzly Stadium to accommodate temporary move from third floor of Clapp building for asbestos abatement. Status report (Word) (10/8/07)
Stan Harris, project leader Upgrade Clapp building 3rd floor data service to 100 Mbs or higher. Status report (Word) (10/8/07)
Dave Kaufman, project leader The DDP is switch room wiring for T1s and other cross connected services to campus from the outside world. The equipment is wall mounted on a rack and needs to be moved into the IPE cabinets. Status report (Word) (1/19/07)
Judy Holbrook/Jameel Chaudry , project leaders Houses at 724 and 730 Eddy are being demolished to make way for construction of steam tunnel. Demolition of these houses will mean occupants will need to move to new location and will require new communication services. Status report (Word) (4/26/07)
Email List Management Software Conversion Jon Robinson/Diane Oman, project leaders LSoft’s e-mail list management software LISTSERV will be implemented as a replacement for the campus’s central e-mail list management system Majordomo. Status report (Word) (1/27/07)
Deb Wiederspan, project leader Due to regulatory requirement, dictated by state and federal legislation, private phone switches (including the University of Montana) are required to provide E-911 service for all stations. Status report (Word) (2/8/07)
Stan Harris, project leader Provide data and telephone service for two people. Status report (Word) (10/8/07)
Interdisciplinary Science Building Telecommunications Stan Harris/Alan Mulkey, project leaders Planning for inclusion of network and telecommunications infrastructure in construction of new Interdisciplinary Science Building. Status report (Word) (4/26/07)
Jeanette Rankin Interim Upgrade Rick Waldorf, project leader Provide wireless data service to building. Status report (Word) (10/8/07)
John Ewan and Jess Neidigh, project leaders Upgrade Knowles Hall data service to 100 Mbs. Status report (Word) (10/8/07)
Liberal Arts Equipment Room Remodel Tom Travis/Stan Harris, project leaders The Liberal Arts equipment room (LA004) will be remodeled to improve efficiency and maintainability of environmental and physical resources required to support electronic equipment housed within the site. The new Liberal Arts equipment room (LA006) will be used to house departmental servers being used to provide enterprise level services to campus and campus customers. Status report (Word) (2/13/07)
Stan Harris/Jameel Chaudry, project leaders Remodel Math building and install new elevator. Project completed Status report (Word) (4/26/07)
McGill Hall Addition (Health & Human Performance) Stan Harris, project leader Oversee project construction and upgrade of first-floor data services. Status report (Word) (10/7/07)
Stan Harris, project leader Upgrade Music building data service to a minimum of 100 Mbs to the desktop with a 1 Gb internal riser bandwidth and 1 Gb feeder service to the building. Status report (Word) (10/8/07)
Old Journalism Building Remodel Stan Harris, project leader Remodel taking place on first and second floors. Status report (Word) (10/8/07)
Stan Harris, project leader Planning and implementation for network and telecommunications services in construction of new Skaggs Addition. Project completed Status report (Word) (3/22/07)
Stan Harris/Laura Howe/Mike Panisko, project leaders Expanded steam tunnel complex will provide heating and other utilities to campus buildings that are now isolated from current tunnels. It will also provide secure, manageable routes for our infrastructure and a new route for some of our at-risk direct buried cables both fiber and copper. Status report (Word) (3/27/07)
Dave Kaufman, project leader Upgrade UM telephone switch (PBX) by replacing outdated EPE equipment with current IPE equipment, upgrade central Nortel Meridian Option 81C PBX equipment to Nortel M1000 PBX. Status report (Word) (2/23/07)
Telephone Services Reorganization Judy Holbrook, project leader Effective 7/1/07, Telecommunication Services will become an 8-5 Mon – Fri department. Non-telecommunications duties will be transferred to the appropriate departments (Public Safety, Facilities Services). 6 dispatchers will go to the Office of Public Safety. Other duties (keys, motor pool, building receptionist) will be transferred to Facility Services. Status report (Word) (4/26/07)
Stan Harris, project leader As part of the Campus Master Plan, The University of Montana is developing a plan for expansion to the South Campus location.IT is exploring the use of Voice over Internet Protocol (VoIP) as a data and voice solution for remote sites. VoIP Plan (Word) (3/20/07)
Windows Vista Key Management Service John Parkey, project leader Microsoft has employed the use of a Key Management Service to identify and manage the licensing activation and validation for desktops for its new Windows Vista operating system. Information Technology needs to provide a server and service to accommodate this new requirement. Status report (Word) (4/26/07)
|
||||||||||||